• Motorcycles High Speed off Road Motorbike Racing Classical Powerfull Fast Speed 72V 80km/H 3000W Electric Motor Motorcycle

Motorcycles High Speed off Road Motorbike Racing Classical Powerfull Fast Speed 72V 80km/H 3000W Electric Motor Motorcycle

After-sales Service: Free Charge
Warranty: 12 Months
Frame Material: Iron Frame
Tire Size: 17inch
Power: 3000W
Certification: EEC
Samples:
US$ 1299/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Gold Member Since 2021

Suppliers with verified business licenses

Rating: 5.0/5
Manufacturer/Factory

Basic Info.

Model NO.
DQ1
Voltage
72V
Color
Red, Green, White, Blue and Black
Battery Capacity
40ah Lithium Battery
Motor Power
2000W
Controller
100A Intelligent Controller
Real Top Speed
60km/H
Max Mileage
80km/H
Charging Time
6-8 Hrs (220V)
Display
LCD Display
Light System
12V LED
L*W*H(mm)
2000X750X1130
Min.Ground Clearance
140
Wheelbase(mm)
1320
Weight with Battery (Kg)
150
Max Loading(Kg)
75
Brake Type
F/R CBS Brakes F 110/70-17; R 140/70-17
Transport Package
Iron Frame and Carton
Specification
2000*750*1130
Trademark
SINEPOWER
Origin
China
HS Code
3202969
Production Capacity
100pieces/Day

Product Description

 1.Product introduction
Motorcycles High Speed off Road Motorbike Racing Classical Powerfull Fast Speed 72V 80km/H 3000W Electric Motor Motorcycle
 Dear customer
Attention:The price not include Tires, Backrest, batteries,charger and transport

2.Motorcycle Picture Motorcycles High Speed off Road Motorbike Racing Classical Powerfull Fast Speed 72V 80km/H 3000W Electric Motor Motorcycle

3.Factory information
Motorcycles High Speed off Road Motorbike Racing Classical Powerfull Fast Speed 72V 80km/H 3000W Electric Motor Motorcycle Motorcycles High Speed off Road Motorbike Racing Classical Powerfull Fast Speed 72V 80km/H 3000W Electric Motor Motorcycle
4.Exhibition Picture
 

Motorcycles High Speed off Road Motorbike Racing Classical Powerfull Fast Speed 72V 80km/H 3000W Electric Motor Motorcycle
Motorcycles High Speed off Road Motorbike Racing Classical Powerfull Fast Speed 72V 80km/H 3000W Electric Motor Motorcycle

5.Transport
Motorcycles High Speed off Road Motorbike Racing Classical Powerfull Fast Speed 72V 80km/H 3000W Electric Motor Motorcycle6.Our Service
1.Reply your inquiry in 24 working hours.
2.Customized design is available.OEM & ODM are welcomed.
3.Professional engineers & Exclusive and unique solution.
4.Well-trained staffs.
5.Return Policy: For defective goods,please send us the pictures to confirm then we will give you the replacement during warranty period.
6.Warranty :We warrant that this product shall be free from defects in material or workmanship for 1 year from the date of purchase.The warranty of the battery is 1year from the date of purchase.This warranty does not apply to any product that has been subject to misuse,abuse,negligence or neglect.Defects caused by tempering ,alterations and /or repairs are not covered by this warranty.
7.Payment :L/C,
Western Union...

7.FAQ

1. Q: Can I get samples before my formal order?
A: Yes, special sample services are available. And the sample cost can be relived once the formal order comes.

2. Q: How do you control the quality?
A: 1. Provide sample test report confirmation; 2. Seal sample confirmation. 3. Shoot production videos during the production process; 4. Send out test reports and test videos when the products are off-line; 5. Use foam cartons and woven bags for packaging, and the perfect packaging method ensures that the products are not damaged during transportation.

3. Q: Can I get a customize service?
A: Yes, ODM OEM services are available. (Appearance color, decal, power, etc. can be customized if the quantity can be above 50sets)

4. Q: What is the warranty time of your products?
A:The motor and controller are guaranteed for 18 months.

5. Q: How about payment terms and price terms?
A: Payment Terms: EXW,FOB,CNF/CFR,CIF,L/C, etc. Price Terms: Sample list 100%;Regular order 100% TT or 100% L/C or 30%TT,70%L/C.The specific payment method can be negotiated.

6. Q: What's the approximate lead time?
A: After the advanced payment confirmed, normally 5 days for stock products,15 days for conventional models , and 30 days for special models.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Gold Member Since 2021

Suppliers with verified business licenses

Rating: 5.0/5
Manufacturer/Factory
Registered Capital
2600 RMB
Management System Certification
ISO 9001